There is no question that roads play an integral part in the daily functioning of a community. So, when road maintenance is required, the speed in which this work can be done is often one of the most crucial elements.

Quasco's rubblization process is 5X faster than traditional construction methods. In fact, one machine can be used to rehabilitate 1 KM of a two-lane road in a 24-hour period.

Inline Process Speeds Re-Paving

By fracturing the existing pavement at a 45-degree angular pattern, an interlocking base material is created that is about twice as effective in load distributing characteristics compared with a high quality dense graded crushed stone base. This new interlocked base material requires no more than two passes with a vibratory roller prior to a hot mix asphalt overlay...no bonding agent is required.